Hello
We deployed a Virtual DPM 2010 server in the lab environement backuping a lot of data.
Now we have deployed the DPM 2010 on a physical server on production environement with a different and bigger storage system.
How could we migrate all the protection groups from the lab DPM server to the production one??
We are trying to put the production one as a secondary DPM and cloning each protection group and when syncroniced then we switch the disaster pretection and delete the protection group switched from primary server, is there another faster procedure??
Thank u all