Hi,
I have two Exchange 2013 servers, CAS and Mailbox role on both and DAG between.
And one unusual setup (maybe :-)) One node is on Hyper-v, another is on VM-ware. VM-ware is backuped with Veeam, and Hyper-V with Microsoft DPM.
Can I (should I?) backup different DAG nodes (in different time, ofc.) with different tools. Is that possible or advisable ?
Thank you