Hi team,
If there are two datacenter sites and I need to enable Active/Active with Multiple DAG implementation, can someone please explain me if the following Mailbox Server Placement is correct?
I need to know if it's possible to host the Two databases within the Two DAGs in the 4 Servers with CAS collocated as shown above.
Why I'm concerned on this is, when I use the Exchange 2013 Calculator and the below inputs, the Role requirement page gives a total of 8 servers for Mailbox role. I thought I can achieve this by using 4 total across both datacenters(2 + 2 Servers hosting the 2 Database Availability Groups pretty much as shown in the above image) What am I missing here.
Thank You,
Chris!