Visio 2013 Callout Process to Link to Next Record

1.  I have box1 diagram that has a callouts linked to it.  I dragged data from External Data box (record 1) to load data into box1 diagram and callout.  I then dragged fields from Shape Data Window into box1 and callout.  I copied box1 and create box2 and then drag fields from record 2 in External Data box into box2 and it's callout.  I then dragged fields from Shape Data Window into box2 and callout.  Is there a automated way to copy box1 with callout to produce box2 with callout then link same fields from record 2 into box2 and it's callout?  Is there a shortcut?

 

Ideally, I would  like to copy box1 to box2 with callout then link next record (like record 2) to box2 and callout automatically.... (Macro???)

July 3rd, 2013 9:16am

HI,

I think it seem to be done with Macros.

And I think you can record macro to get vba code to link callout to data record, then modify the code to loop to run the code.

Free Windows Admin Tool Kit Click here and download it now
July 4th, 2013 2:42am

 I thought about macros but I was not sure how to goto next record and if last record end loop (how to end process).  I may have 5, 10, 20.... to loop through.  It could vary....  If you had an example that would be great.

Thanks for your input Jaynet.

July 5th, 2013 7:26am

This topic is archived. No further replies will be accepted.