Exchange 2010 SP2 2 host DAG.
The mounted database has a clean shutdown state.
I reseeded the database copy and that was sucessful.
However when it tries to do resynchronizing the copy queue length continues to grow and it fails.
I'm also seeing this in the logs
The active copy of Mailbox Database Faculty has a missing or corrupted log file (E030042A9B0.log). To keep this copy healthy, replication will restart at generation 4368817. A full backup must be performed before an incremental backup is possible.
Should I delete the database copy and create a new one and let it reseed?